← All Technologies
Biological TreatmentIndustrialMunicipal
Compatible Aeration System
A long-retention aeration process that pairs with any primary treatment stage, adjusting dissolved oxygen automatically for peak loads.
Hydraulic retention> 22 hrs
Sludge age~ 5 days
vs. conventional HRT6–16 hrs
Process Diagram
Diagram to be supplied by UEE engineering.
Capacity rangeTo be confirmed
Influent / effluent conditionsTo be confirmed
FootprintTo be confirmed
Operating requirementsTo be confirmed
InstallationsTo be confirmed
Technical Data SheetDownload (coming soon)