Universal Environmental Engineering
All Technologies
Biological TreatmentIndustrialMunicipal

Compatible Aeration System

A long-retention aeration process that pairs with any primary treatment stage, adjusting dissolved oxygen automatically for peak loads.

Hydraulic retention> 22 hrs
Sludge age~ 5 days
vs. conventional HRT6–16 hrs

Process Diagram

Diagram to be supplied by UEE engineering.

Capacity rangeTo be confirmed
Influent / effluent conditionsTo be confirmed
FootprintTo be confirmed
Operating requirementsTo be confirmed
InstallationsTo be confirmed
Technical Data SheetDownload (coming soon)